Cruise ShipsETFE
Client: Vector Foiltec for FincantieriData: February 2025
Info: Mounting of ETFE double-layer cushion cover.
On behalf of Vector Foiltec, Maco Technology installed the 750 square metre ETFE cover called Grotto at the Fincantieri shipyard in Monfalcone. The complex-shaped cover is made up of 140 different cushions. The assembly took 3 months.
Here is the full video presentation of the ship:












